Green Line: stations, map and interchanges

Green Line is a line of Baku Metro in Baku with 10 stations, running from Dərnəgül to Şah İsmayıl Xətai. As the crow flies, the stations add up to about 14.4 km and the end-to-end trip takes around 27 minutes (estimated, no waiting on platforms).

View Green Line on the interactive map →

Status right now: No alerts in the news
From news reports · checked at 12:31

Stations of Green Line

In track order, from Dərnəgül to Şah İsmayıl Xətai.

  1. 1 Dərnəgül Terminal
  2. 2 Azadlıq prospekti
  3. 3 Nəsimi
  4. 4 Memar Əcəmi Interchange
  5. 5 20 Yanvar
  6. 6 İnşaatçılar
  7. 7 Elmlər Akademiyası
  8. 8 Nizami
  9. 9 Cəfər Cabbarlı
  10. 10 Şah İsmayıl Xətai Terminal

Interchanges with other lines

At these stations you can change from Green Line to another line:

StationIntegrates with
Memar Əcəmi Purple Line

Frequently asked questions

How many stations does Green Line have?

Green Line has 10 stations, from Dərnəgül to Şah İsmayıl Xətai.

How long is the end-to-end trip on Green Line?

About 27 minutes between Dərnəgül and Şah İsmayıl Xətai. It is an estimate based on the distance between stations; the real time varies through the day.

Where does Green Line connect with other lines?

The interchanges are: Memar Əcəmi (Purple Line).

Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.

All lines and stations of Baku Metro