Linha 2-Verde: stations, map and interchanges

Linha 2-Verde is a line of MetrôRio in Rio de Janeiro with 26 stations, running from Pavuna to Botafogo. As the crow flies, the stations add up to about 29.3 km and the end-to-end trip takes around 66 minutes (estimated, no waiting on platforms).

View Linha 2-Verde on the interactive map →

Status right now: No alerts in the news
From news reports · checked at 04:30

Opening hours (reference)

Closed now by the reference hours; reopens today at 05:00.

ServiceDayOpensCloses
MetrôRio (Lines 1, 2 and 4)Mon–Fri05:0000:00
MetrôRio (Lines 1, 2 and 4)Saturday05:0000:00
MetrôRio (Lines 1, 2 and 4)Sunday07:0023:00
MetrôRio (Lines 1, 2 and 4)Public holidays07:0023:00

Reference hours: they vary by line, station and day (holidays, events and works). Always confirm on the official channels.

This network has no holiday calendar here: on public holidays the hours of the day of the week are used.

Hours and line status today →

Stations of Linha 2-Verde

In track order, from Pavuna to Botafogo.

  1. 1 Pavuna Terminal
  2. 2 Engenheiro Rubens Paiva
  3. 3 Acari / Fazenda Botafogo
  4. 4 Coelho Neto
  5. 5 Colégio
  6. 6 Irajá
  7. 7 Vicente de Carvalho
  8. 8 Thomáz Coelho
  9. 9 Engenho da Rainha
  10. 10 Inhaúma
  11. 11 Del Castilho
  12. 12 Maria da Graça
  13. 13 Triagem
  14. 14 Maracanã
  15. 15 São Cristóvão
  16. 16 Cidade Nova
  17. 17 Central do Brasil / Centro Interchange
  18. 18 Saara / Presidente Vargas Interchange
  19. 19 Uruguaiana / Engenheiro Fernando Mac Dowell Interchange
  20. 20 Carioca Interchange
  21. 21 Cinelândia / Centro Interchange
  22. 22 Glória Interchange
  23. 23 Catete Interchange
  24. 24 Largo do Machado Interchange
  25. 25 Flamengo Interchange
  26. 26 Botafogo Terminal Interchange

Interchanges with other lines

At these stations you can change from Linha 2-Verde to another line:

StationIntegrates with
Central do Brasil / Centro Linha 1-Laranja
Saara / Presidente Vargas Linha 1-Laranja
Uruguaiana / Engenheiro Fernando Mac Dowell Linha 1-Laranja
Carioca Linha 1-Laranja
Cinelândia / Centro Linha 1-Laranja
Glória Linha 1-Laranja
Catete Linha 1-Laranja
Largo do Machado Linha 1-Laranja
Flamengo Linha 1-Laranja
Botafogo Linha 1-Laranja

Frequently asked questions

How many stations does Linha 2-Verde have?

Linha 2-Verde has 26 stations, from Pavuna to Botafogo.

How long is the end-to-end trip on Linha 2-Verde?

About 66 minutes between Pavuna and Botafogo. It is an estimate based on the distance between stations; the real time varies through the day.

Where does Linha 2-Verde connect with other lines?

The interchanges are: Central do Brasil / Centro (Linha 1-Laranja); Saara / Presidente Vargas (Linha 1-Laranja); Uruguaiana / Engenheiro Fernando Mac Dowell (Linha 1-Laranja); Carioca (Linha 1-Laranja); Cinelândia / Centro (Linha 1-Laranja); Glória (Linha 1-Laranja); Catete (Linha 1-Laranja); Largo do Machado (Linha 1-Laranja); Flamengo (Linha 1-Laranja); Botafogo (Linha 1-Laranja).

Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.

Route from Pavuna to Botafogo

All lines and stations of MetrôRio