Line 4 Sheppard: stations, map and interchanges

Line 4 Sheppard is a line of Toronto Subway and LRT in Toronto with 5 stations, running from Don Mills to Sheppard-Yonge. As the crow flies, the stations add up to about 5.4 km and the end-to-end trip takes around 9 minutes (estimated, no waiting on platforms).

View Line 4 Sheppard on the interactive map →

Status right now: No alerts in the news
From news reports · checked at 02:55

Opening hours (reference)

ServiceOpensCloses
Lines 1, 2, 4, 5 and 6, Monday–Friday04:5502:33 (night after the service day; last departure from any station)
Lines 1, 2, 4, 5 and 6, Saturday04:5802:30 (night after the service day; last departure from any station)
Lines 1, 2, 4, 5 and 6, Sunday07:3002:30 (night after the service day; last departure from any station)

Reference hours: they vary by line, station and day (holidays, events and works). Always confirm on the official channels.

Hours and line status today →

Stations of Line 4 Sheppard

In track order, from Don Mills to Sheppard-Yonge.

  1. 1 Don Mills Terminal
  2. 2 Leslie
  3. 3 Bessarion
  4. 4 Bayview
  5. 5 Sheppard-Yonge Terminal Interchange

Interchanges with other lines

At these stations you can change from Line 4 Sheppard to another line:

StationIntegrates with
Sheppard-Yonge Line 1 Yonge–University

Frequently asked questions

How many stations does Line 4 Sheppard have?

Line 4 Sheppard has 5 stations, from Don Mills to Sheppard-Yonge.

How long is the end-to-end trip on Line 4 Sheppard?

About 9 minutes between Don Mills and Sheppard-Yonge. It is an estimate based on the distance between stations; the real time varies through the day.

Where does Line 4 Sheppard connect with other lines?

The interchanges are: Sheppard-Yonge (Line 1 Yonge–University).

Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.

Route from Don Mills to Sheppard-Yonge

All lines and stations of Toronto Subway and LRT