Line 19: stations, map and interchanges

Line 19 is a line of Beijing Subway in Beijing with 10 stations, running from Mudanyuan to Xin'Gong. As the crow flies, the stations add up to about 19.6 km and the end-to-end trip takes around 40 minutes (estimated, no waiting on platforms).

View Line 19 on the interactive map →

Status right now: No alerts in the news
From news reports · checked at 15:35

Stations of Line 19

In track order, from Mudanyuan to Xin'Gong.

  1. 1 Mudanyuan Terminal Interchange
  2. 2 Beitaipingzhuang Interchange
  3. 3 Jishuitan Interchange
  4. 4 Ping'anli Interchange
  5. 5 Taipingqiao
  6. 6 Niujie
  7. 7 Jingfengmen Interchange
  8. 8 Caoqiao Interchange
  9. 9 Xinfadi
  10. 10 Xin'Gong Terminal Interchange

Interchanges with other lines

At these stations you can change from Line 19 to another line:

StationIntegrates with
Mudanyuan Line 10
Beitaipingzhuang Line 12
Jishuitan Line 2
Ping'anli Line 4 / Daxing Line Line 6
Jingfengmen Line 14
Caoqiao Line 10 Daxing Airport Express
Xin'Gong Line 4 / Daxing Line

Frequently asked questions

How many stations does Line 19 have?

Line 19 has 10 stations, from Mudanyuan to Xin'Gong.

How long is the end-to-end trip on Line 19?

About 40 minutes between Mudanyuan and Xin'Gong. It is an estimate based on the distance between stations; the real time varies through the day.

Where does Line 19 connect with other lines?

The interchanges are: Mudanyuan (Line 10); Beitaipingzhuang (Line 12); Jishuitan (Line 2); Ping'anli (Line 4 / Daxing Line, Line 6); Jingfengmen (Line 14); Caoqiao (Line 10, Daxing Airport Express); Xin'Gong (Line 4 / Daxing Line).

Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.

Route from Mudanyuan to Xin'Gong

All lines and stations of Beijing Subway