Line 13: stations, map and interchanges
Line 13 is a line of Chengdu Metro in Chengdu with 21 stations, running from Long'an to Wayaotan. As the crow flies, the stations add up to about 27.7 km and the end-to-end trip takes around 60 minutes (estimated, no waiting on platforms).
View Line 13 on the interactive map →
Status right now:
No alerts in the news
From news reports · checked at 16:02
Stations of Line 13
- 1 Long'an Terminal
- 2 Longhuasi
- 3 Sansheng Flower Town
- 4 Xingfu Meilin
- 5 Jiaozi Flyover Interchange
- 6 Sichuan Normal University Interchange
- 7 Jingjusi Interchange
- 8 Sanguantang Interchange
- 9 Jiuyan Bridge
- 10 Xinnanmen Interchange
- 11 Huaxiba Interchange
- 12 Wenweng Shishi
- 13 Xiaonan Street Interchange
- 14 Qingyang Taoist Temple Interchange
- 15 Du Fu Thatched Cottage
- 16 Guanghuacun
- 17 Dongpo Road Interchange
- 18 Wanshou Bridge
- 19 Peifeng Interchange
- 20 Wanjiawan
- 21 Wayaotan Terminal
Interchanges with other lines
At these stations you can change from Line 13 to another line:
Frequently asked questions
How many stations does Line 13 have?
Line 13 has 21 stations, from Long'an to Wayaotan.
How long is the end-to-end trip on Line 13?
About 60 minutes between Long'an and Wayaotan. It is an estimate based on the distance between stations; the real time varies through the day.
Where does Line 13 connect with other lines?
The interchanges are: Jiaozi Flyover (Line 30); Sichuan Normal University (Line 7); Jingjusi (Line 8); Sanguantang (Line 6); Xinnanmen (Line 3); Huaxiba (Line 1); Xiaonan Street (Line 17); Qingyang Taoist Temple (Line 5); Dongpo Road (Line 7); Peifeng (Line 9).
Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.