Line 1: stations, map and interchanges
Line 1 is a line of Fuzhou Metro in Fuzhou with 25 stations, running from Xiangfeng to Sanjiangkou. As the crow flies, the stations add up to about 27.9 km and the end-to-end trip takes around 63 minutes (estimated, no waiting on platforms).
View Line 1 on the interactive map →
Status right now:
No alerts in the news
From news reports · checked at 15:56
Stations of Line 1
- 1 Xiangfeng Terminal
- 2 Xiushan
- 3 Luohanshan
- 4 Fuzhou Railway Interchange
- 5 Doumen
- 6 Shudou
- 7 Pingshan
- 8 Dongjiekou Interchange
- 9 Nanmendou Interchange
- 10 Chating
- 11 Dadao
- 12 Shangteng
- 13 Sanchajie
- 14 Baihuting
- 15 Huluzhen
- 16 Huangshan
- 17 Paixia
- 18 Chengmen Interchange
- 19 Sanjiaocheng
- 20 Lulei
- 21 Fuzhou South Railway Interchange
- 22 Anping
- 23 Liangcuo Interchange
- 24 Xiayang Interchange
- 25 Sanjiangkou Terminal
Interchanges with other lines
At these stations you can change from Line 1 to another line:
| Station | Integrates with |
|---|---|
| Fuzhou Railway | Binhai Express |
| Dongjiekou | Line 4 |
| Nanmendou | Line 2 |
| Chengmen | Line 4 |
| Fuzhou South Railway | Line 5 |
| Liangcuo | Line 6 |
| Xiayang | Line 6 |
Frequently asked questions
How many stations does Line 1 have?
Line 1 has 25 stations, from Xiangfeng to Sanjiangkou.
How long is the end-to-end trip on Line 1?
About 63 minutes between Xiangfeng and Sanjiangkou. It is an estimate based on the distance between stations; the real time varies through the day.
Where does Line 1 connect with other lines?
The interchanges are: Fuzhou Railway (Binhai Express); Dongjiekou (Line 4); Nanmendou (Line 2); Chengmen (Line 4); Fuzhou South Railway (Line 5); Liangcuo (Line 6); Xiayang (Line 6).
Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.