Line 7: stations, map and interchanges
Line 7 is a line of Guangzhou Metro in Guangzhou with 27 stations, running from Meidi Dadao to Yanshan. As the crow flies, the stations add up to about 49.2 km and the end-to-end trip takes around 103 minutes (estimated, no waiting on platforms).
View Line 7 on the interactive map →
Status right now:
No alerts in the news
From news reports · checked at 16:31
Stations of Line 7
- 1 Meidi Dadao Terminal
- 2 Beijiao Park
- 3 Midea
- 4 Nanchong
- 5 Jinlong
- 6 Chencun
- 7 Chencunbei
- 8 Dazhou
- 9 Guangzhou South Railway Station Interchange
- 10 Shibi Interchange
- 11 Xiecun
- 12 Zhongcun
- 13 Hanxi Changlong Interchange
- 14 Nancun Wanbo Interchange
- 15 Yuangang
- 16 Banqiao
- 17 Higher Education Mega Center South Interchange
- 18 Shenjing
- 19 Changzhou
- 20 Yufengwei Interchange
- 21 Dashadong Interchange
- 22 Jitang
- 23 Jiazhuang
- 24 Kefeng Road
- 25 Luogang Interchange
- 26 Shuixi Interchange
- 27 Yanshan Terminal
Interchanges with other lines
At these stations you can change from Line 7 to another line:
Frequently asked questions
How many stations does Line 7 have?
Line 7 has 27 stations, from Meidi Dadao to Yanshan.
How long is the end-to-end trip on Line 7?
About 103 minutes between Meidi Dadao and Yanshan. It is an estimate based on the distance between stations; the real time varies through the day.
Where does Line 7 connect with other lines?
The interchanges are: Guangzhou South Railway Station (Line 2, Line 22); Shibi (Line 2); Hanxi Changlong (Line 3); Nancun Wanbo (Line 18); Higher Education Mega Center South (Line 4, Line 12); Yufengwei (Line 13); Dashadong (Line 5); Luogang (Line 6); Shuixi (Line 21).
Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.