Line 5: stations, map and interchanges
Line 5 is a line of Kunming Metro in Kunming with 22 stations, running from Baofeng to World Horti-Expo Garden. As the crow flies, the stations add up to about 24.6 km and the end-to-end trip takes around 55 minutes (estimated, no waiting on platforms).
View Line 5 on the interactive map →
Status right now:
No alerts in the news
From news reports · checked at 15:26
Stations of Line 5
- 1 Baofeng Terminal
- 2 Dianchi International Convention and Exhibition Center
- 3 Fubao
- 4 Jinjia River
- 5 Zhuangjiatang Overpass
- 6 Xingti Road
- 7 Yuhucun
- 8 Yinghai Road
- 9 Daba
- 10 Guangfuluxikou
- 11 Fuhai
- 12 Jinlan Road
- 13 Yanjiadi
- 14 Milesi
- 15 Wuyi Road Interchange
- 16 Huashan West Road
- 17 Yuantong Hill
- 18 North Railway Station Interchange
- 19 Chuanjin Road
- 20 Shizha
- 21 Bailongsi
- 22 World Horti-Expo Garden Terminal
Interchanges with other lines
At these stations you can change from Line 5 to another line:
| Station | Integrates with |
|---|---|
| Wuyi Road | Line 3 |
| North Railway Station | Line 2 Line 4 |
Frequently asked questions
How many stations does Line 5 have?
Line 5 has 22 stations, from Baofeng to World Horti-Expo Garden.
How long is the end-to-end trip on Line 5?
About 55 minutes between Baofeng and World Horti-Expo Garden. It is an estimate based on the distance between stations; the real time varies through the day.
Where does Line 5 connect with other lines?
The interchanges are: Wuyi Road (Line 3); North Railway Station (Line 2, Line 4).
Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.