Line 3: stations, map and interchanges
Line 3 is a line of Nanning Metro in Nanning with 23 stations, running from Keyuan Dadao to Pingliang Overpass. As the crow flies, the stations add up to about 26.3 km and the end-to-end trip takes around 59 minutes (estimated, no waiting on platforms).
View Line 3 on the interactive map →
Status right now:
No alerts in the news
From news reports · checked at 15:47
Stations of Line 3
- 1 Keyuan Dadao Terminal
- 2 Chuangye Road
- 3 Anji Coach Station Interchange
- 4 Beihubei Road
- 5 Xiufeng Road
- 6 Yongwu Road
- 7 Dajicun
- 8 Xinggui Road
- 9 Xiaojicun Interchange
- 10 Donggouling
- 11 Changgang Road
- 12 Dongge Road
- 13 Binhu Road
- 14 Jinhu Square Interchange
- 15 Langxi
- 16 Qingzhu Overpass
- 17 Qingxiushan
- 18 Nanning Museum
- 19 Advanced Business Park Interchange
- 20 Guangxi Planning Exhibition Hall
- 21 Qing'ge Road
- 22 Wuxiang Lake
- 23 Pingliang Overpass Terminal Interchange
Interchanges with other lines
At these stations you can change from Line 3 to another line:
| Station | Integrates with |
|---|---|
| Anji Coach Station | Line 2 |
| Xiaojicun | Line 5 |
| Jinhu Square | Line 1 |
| Advanced Business Park | Line 4 |
| Pingliang Overpass | Line 2 |
Frequently asked questions
How many stations does Line 3 have?
Line 3 has 23 stations, from Keyuan Dadao to Pingliang Overpass.
How long is the end-to-end trip on Line 3?
About 59 minutes between Keyuan Dadao and Pingliang Overpass. It is an estimate based on the distance between stations; the real time varies through the day.
Where does Line 3 connect with other lines?
The interchanges are: Anji Coach Station (Line 2); Xiaojicun (Line 5); Jinhu Square (Line 1); Advanced Business Park (Line 4); Pingliang Overpass (Line 2).
Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.