Line 1: stations, map and interchanges
Line 1 is a line of Shenyang Metro in Shenyang with 32 stations, running from Shisanhao Jie to Shuangma. As the crow flies, the stations add up to about 41.1 km and the end-to-end trip takes around 91 minutes (estimated, no waiting on platforms).
View Line 1 on the interactive map →
Status right now:
No alerts in the news
From news reports · checked at 15:47
Stations of Line 1
- 1 Shisanhao Jie Terminal
- 2 Zhongyangdajie
- 3 Qihaojie
- 4 Sihaojie
- 5 Zhangshi
- 6 Kaifadadao
- 7 Yuhongguangchang
- 8 Yingbinlu
- 9 Zhonggongjie
- 10 Qigongjie
- 11 Baogongjie
- 12 Tiexiguangchang Interchange
- 13 Yunfengbeijie
- 14 Shenyangzhan
- 15 Taiyuanjie Interchange
- 16 Nanshichang
- 17 Qingniandajie Interchange
- 18 Huaiyuanmen
- 19 Zhongjie
- 20 Dongzhongjie
- 21 Pangjiangjie Interchange
- 22 Liming Square
- 23 Xinhuijie
- 24 Xinningjie
- 25 Dongdayingjie
- 26 Nongyedaxue
- 27 Qianling
- 28 Donglinggongyuan
- 29 Shuiquan
- 30 Boguanbeidajie
- 31 Zhiwuyuan
- 32 Shuangma Terminal
Interchanges with other lines
At these stations you can change from Line 1 to another line:
| Station | Integrates with |
|---|---|
| Tiexiguangchang | Line 9 |
| Taiyuanjie | Line 4 |
| Qingniandajie | Line 2 |
| Pangjiangjie | Line 10 |
Frequently asked questions
How many stations does Line 1 have?
Line 1 has 32 stations, from Shisanhao Jie to Shuangma.
How long is the end-to-end trip on Line 1?
About 91 minutes between Shisanhao Jie and Shuangma. It is an estimate based on the distance between stations; the real time varies through the day.
Where does Line 1 connect with other lines?
The interchanges are: Tiexiguangchang (Line 9); Taiyuanjie (Line 4); Qingniandajie (Line 2); Pangjiangjie (Line 10).
Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.