Line 1: stations, map and interchanges

Line 1 is a line of Shijiazhuang Metro in Shijiazhuang with 26 stations, running from Xiwang to Fuze. As the crow flies, the stations add up to about 32.4 km and the end-to-end trip takes around 71 minutes (estimated, no waiting on platforms).

View Line 1 on the interactive map →

Status right now: No alerts in the news
From news reports · checked at 16:12

Stations of Line 1

In track order, from Xiwang to Fuze.

  1. 1 Xiwang Terminal
  2. 2 Shiguangjie
  3. 3 Changchengqiao
  4. 4 Hepingyiyuan
  5. 5 Lieshilingyuan
  6. 6 Xinbaiguangchang Interchange
  7. 7 Jiefangguangchang
  8. 8 Ping'andajie
  9. 9 Beiguo Commercial Building Interchange
  10. 10 Bowuyuan
  11. 11 Tiyuchang
  12. 12 Beisong
  13. 13 Tangu
  14. 14 Chaohuiqiao
  15. 15 Baifo
  16. 16 Liucun
  17. 17 Huojuguangchang
  18. 18 Shijiazhuang East Railway Station
  19. 19 Nancun
  20. 20 Xiaohedadao
  21. 21 Xizhuang
  22. 22 Dongzhuang
  23. 23 Huizhanzhongxin
  24. 24 Shangwuzhongxin
  25. 25 Yuanboyuan
  26. 26 Fuze Terminal

Interchanges with other lines

At these stations you can change from Line 1 to another line:

StationIntegrates with
Xinbaiguangchang Line 3
Beiguo Commercial Building Line 2

Frequently asked questions

How many stations does Line 1 have?

Line 1 has 26 stations, from Xiwang to Fuze.

How long is the end-to-end trip on Line 1?

About 71 minutes between Xiwang and Fuze. It is an estimate based on the distance between stations; the real time varies through the day.

Where does Line 1 connect with other lines?

The interchanges are: Xinbaiguangchang (Line 3); Beiguo Commercial Building (Line 2).

Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.

Route from Xiwang to Fuze

All lines and stations of Shijiazhuang Metro