Line S1: stations, map and interchanges

Line S1 is a line of Taizhou Rail Transit in Taizhou with 15 stations, running from Taizhou Railway to Chengnan. As the crow flies, the stations add up to about 45.8 km and the end-to-end trip takes around 90 minutes (estimated, no waiting on platforms).

View Line S1 on the interactive map →

Status right now: No alerts in the news
From news reports · checked at 15:47

Stations of Line S1

In track order, from Taizhou Railway to Chengnan.

  1. 1 Taizhou Railway Terminal
  2. 2 Xueyuan Road
  3. 3 International Expo Center
  4. 4 Huifeng Road
  5. 5 Jintai
  6. 6 Enze Hospital
  7. 7 Taizhou South Bus
  8. 8 Zeguo
  9. 9 Wenling Railway
  10. 10 Huichuanwang
  11. 11 Wenling First People's Hospital
  12. 12 Jiulong Avenue
  13. 13 Wanchang Road
  14. 14 Nanping
  15. 15 Chengnan Terminal

Frequently asked questions

How many stations does Line S1 have?

Line S1 has 15 stations, from Taizhou Railway to Chengnan.

How long is the end-to-end trip on Line S1?

About 90 minutes between Taizhou Railway and Chengnan. It is an estimate based on the distance between stations; the real time varies through the day.

Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.

Route from Taizhou Railway to Chengnan

All lines and stations of Taizhou Rail Transit