Chengjiao Line: stations, map and interchanges
Chengjiao Line is a line of Zhengzhou Metro in Zhengzhou with 18 stations, running from Zhengzhou Hangkonggang Railway Station to Nansihuan. As the crow flies, the stations add up to about 37.4 km and the end-to-end trip takes around 77 minutes (estimated, no waiting on platforms).
View Chengjiao Line on the interactive map →
Status right now:
No alerts in the news
From news reports · checked at 16:22
Stations of Chengjiao Line
- 1 Zhengzhou Hangkonggang Railway Station Terminal
- 2 Gangqu Huizhan
- 3 Jichang Dong
- 4 Xinzheng International Airport
- 5 Zonghebaoshuiqu
- 6 Enpinghu
- 7 Lanhegongyuan
- 8 Kangpinghu
- 9 Gangqu Bei Interchange
- 10 Mengzhuang
- 11 Hua'nancheng East
- 12 Hua'nancheng
- 13 Hua'nancheng West
- 14 Xiaoqiao
- 15 Shuanghudadao
- 16 Shawoli
- 17 Shibalihe
- 18 Nansihuan Terminal Interchange
Interchanges with other lines
At these stations you can change from Chengjiao Line to another line:
| Station | Integrates with |
|---|---|
| Gangqu Bei | Zhengxu Line |
| Nansihuan | Line 2 |
Frequently asked questions
How many stations does Chengjiao Line have?
Chengjiao Line has 18 stations, from Zhengzhou Hangkonggang Railway Station to Nansihuan.
How long is the end-to-end trip on Chengjiao Line?
About 77 minutes between Zhengzhou Hangkonggang Railway Station and Nansihuan. It is an estimate based on the distance between stations; the real time varies through the day.
Where does Chengjiao Line connect with other lines?
The interchanges are: Gangqu Bei (Zhengxu Line); Nansihuan (Line 2).
Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.
Route from Zhengzhou Hangkonggang Railway Station to Nansihuan