Line 1: stations, map and interchanges

Line 1 is a line of Almaty Metro in Almaty with 11 stations, running from Raiymbek batyr to Bauyrzhan Momyshuly. As the crow flies, the stations add up to about 13.0 km and the end-to-end trip takes around 29 minutes (estimated, no waiting on platforms).

View Line 1 on the interactive map →

Status right now: No alerts in the news
From news reports · checked at 12:26

Network hours

ServiceOpensCloses
Metro06:2000:00

Reference hours: they vary by line, station and day (holidays, events and works). Always confirm on the official channels.

Hours and line status today →

Stations of Line 1

In track order, from Raiymbek batyr to Bauyrzhan Momyshuly.

  1. 1 Raiymbek batyr Terminal
  2. 2 Zhibek Zholy
  3. 3 Almaly
  4. 4 Abay
  5. 5 Baikonur
  6. 6 Auezov Theatre
  7. 7 Alatau
  8. 8 Sayran
  9. 9 Moskva
  10. 10 Saryarka
  11. 11 Bauyrzhan Momyshuly Terminal

Frequently asked questions

How many stations does Line 1 have?

Line 1 has 11 stations, from Raiymbek batyr to Bauyrzhan Momyshuly.

How long is the end-to-end trip on Line 1?

About 29 minutes between Raiymbek batyr and Bauyrzhan Momyshuly. It is an estimate based on the distance between stations; the real time varies through the day.

Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.

Route from Raiymbek batyr to Bauyrzhan Momyshuly

All lines and stations of Almaty Metro