Kajang Line: stations, map and interchanges
Kajang Line is a line of Rapid KL Rail in Kuala Lumpur with 29 stations, running from Kajang to Kwasa Damansara. As the crow flies, the stations add up to about 43.1 km and the end-to-end trip takes around 93 minutes (estimated, no waiting on platforms).
View Kajang Line on the interactive map →
Status right now:
No alerts in the news
From news reports · checked at 15:31
Stations of Kajang Line
- 1 Kajang Terminal
- 2 Stadium Kajang
- 3 Sungai Jernih
- 4 Bukit Dukung
- 5 Batu 11 Cheras
- 6 Bandar Tun Hussein Onn
- 7 Sri Raya
- 8 Taman Suntex
- 9 Taman Connaught
- 10 Taman Mutiara
- 11 Taman Midah
- 12 Taman Pertama
- 13 Maluri Interchange
- 14 Cochrane
- 15 Tun Razak Exchange Interchange
- 16 Bukit Bintang (Kajang Line)
- 17 Merdeka
- 18 Pasar Seni Interchange
- 19 Muzium Negara
- 20 Semantan
- 21 Pusat Bandar Damansara
- 22 Phileo Damansara
- 23 Taman Tun Dr Ismail
- 24 Bandar Utama
- 25 Mutiara Damansara
- 26 Surian
- 27 Kota Damansara
- 28 Kwasa Sentral
- 29 Kwasa Damansara Terminal Interchange
Interchanges with other lines
At these stations you can change from Kajang Line to another line:
| Station | Integrates with |
|---|---|
| Maluri | Ampang Line |
| Tun Razak Exchange | Putrajaya Line |
| Pasar Seni | Kelana Jaya Line |
| Kwasa Damansara | Putrajaya Line |
Frequently asked questions
How many stations does Kajang Line have?
Kajang Line has 29 stations, from Kajang to Kwasa Damansara.
How long is the end-to-end trip on Kajang Line?
About 93 minutes between Kajang and Kwasa Damansara. It is an estimate based on the distance between stations; the real time varies through the day.
Where does Kajang Line connect with other lines?
The interchanges are: Maluri (Ampang Line); Tun Razak Exchange (Putrajaya Line); Pasar Seni (Kelana Jaya Line); Kwasa Damansara (Putrajaya Line).
Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.