Línea 4: stations, map and interchanges

Línea 4 is a line of Tren Ligero de Guadalajara in Guadalajara with 8 stations, running from Tlajomulco Centro to Las Juntas. As the crow flies, the stations add up to about 19.5 km and the end-to-end trip takes around 39 minutes (estimated, no waiting on platforms).

View Línea 4 on the interactive map →

Status right now: No alerts in the news
From news reports · checked at 02:35

Stations of Línea 4

In track order, from Tlajomulco Centro to Las Juntas.

  1. 1 Tlajomulco Centro Terminal
  2. 2 CUTLAJO
  3. 3 Lomas del Sur
  4. 4 El Cuervo
  5. 5 Concepción del Valle
  6. 6 Real del Valle
  7. 7 Jalisco 200 Años
  8. 8 Las Juntas Terminal

Frequently asked questions

How many stations does Línea 4 have?

Línea 4 has 8 stations, from Tlajomulco Centro to Las Juntas.

How long is the end-to-end trip on Línea 4?

About 39 minutes between Tlajomulco Centro and Las Juntas. It is an estimate based on the distance between stations; the real time varies through the day.

Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.

Route from Tlajomulco Centro to Las Juntas

All lines and stations of Tren Ligero de Guadalajara