Yellow Line: stations, map and interchanges

Yellow Line is a line of Bangkok MRT in Bangkok with 23 stations, running from Lat Phrao to Samrong. As the crow flies, the stations add up to about 28.3 km and the end-to-end trip takes around 63 minutes (estimated, no waiting on platforms).

View Yellow Line on the interactive map →

Status right now: No alerts in the news
From news reports · checked at 15:25

Network hours

ServiceOpensCloses
MRT05:0001:00 (Yellow Line, per EBM; 00:00 on the other lines)

Reference hours: they vary by line, station and day (holidays, events and works). Always confirm on the official channels.

Hours and line status today →

Stations of Yellow Line

In track order, from Lat Phrao to Samrong.

  1. 1 Lat Phrao Terminal Interchange
  2. 2 Phawana
  3. 3 Chok Chai 4
  4. 4 Lat Phrao 71
  5. 5 Lat Phrao 83
  6. 6 Mahatthai
  7. 7 Lat Phrao 101
  8. 8 Bang Kapi
  9. 9 Yaek Lam Sali
  10. 10 Si Kritha
  11. 11 Hua Mak
  12. 12 Kalantan
  13. 13 Si Nut
  14. 14 Srinagarindra 38
  15. 15 Suan Luang Rama IX
  16. 16 Si Udom
  17. 17 Si Iam
  18. 18 Si La Salle
  19. 19 Si Bearing
  20. 20 Si Dan
  21. 21 Si Thepha
  22. 22 Thipphawan
  23. 23 Samrong Terminal

Interchanges with other lines

At these stations you can change from Yellow Line to another line:

StationIntegrates with
Lat Phrao Blue Line

Frequently asked questions

How many stations does Yellow Line have?

Yellow Line has 23 stations, from Lat Phrao to Samrong.

How long is the end-to-end trip on Yellow Line?

About 63 minutes between Lat Phrao and Samrong. It is an estimate based on the distance between stations; the real time varies through the day.

Where does Yellow Line connect with other lines?

The interchanges are: Lat Phrao (Blue Line).

Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.

Route from Lat Phrao to Samrong

All lines and stations of Bangkok MRT