Green Line: stations, map and interchanges

Green Line is a line of Chicago L in Chicago with 30 stations, running from Harlem/Lake to Cottage Grove. As the crow flies, the stations add up to about 27.3 km and the end-to-end trip takes around 78 minutes (estimated, no waiting on platforms).

View Green Line on the interactive map →

Status right now: Partial service Source: CTA · checked at 01:45

Active incidents

Partial service on Green Line Partial service

Status updated: Partial service (source: CTA).

Recent incidents

Incidents of Green Line resolved in the last 30 days. Times are local.

Partial service on Green Line Resolved

Service is back to normal. Incident closed.

From October 17, 2026 2:45 PM to October 30, 2026 3:05 PM · duration 18740 min

Opening hours (reference)

ServiceOpensCloses
Brown, Green, Orange, Pink, Purple and Yellow Lines, Monday–Friday03:3002:49 (night after the service day; last departure from any station)
Brown, Green, Orange, Pink, Purple and Yellow Lines, Saturday04:0002:49 (night after the service day; last departure from any station)
Brown, Green, Orange, Pink, Purple and Yellow Lines, Sunday04:3002:19 (night after the service day; last departure from any station)

Reference hours: they vary by line, station and day (holidays, events and works). Always confirm on the official channels.

Hours and line status today →

Stations of Green Line

In track order, from Harlem/Lake to Cottage Grove.

  1. 1 Harlem/Lake Terminal
  2. 2 Oak Park
  3. 3 Ridgeland
  4. 4 Austin
  5. 5 Central
  6. 6 Laramie
  7. 7 Cicero
  8. 8 Pulaski
  9. 9 Conservatory-Central Park Drive
  10. 10 Kedzie
  11. 11 California
  12. 12 Damen
  13. 13 Ashland Interchange
  14. 14 Morgan Interchange
  15. 15 Clinton Interchange
  16. 16 Clark/Lake Interchange
  17. 17 Washington/Wabash Interchange
  18. 18 Adams/Wabash Interchange
  19. 19 Roosevelt Interchange
  20. 20 Cermak-McCormick Place
  21. 21 35th-Bronzeville-IIT
  22. 22 Indiana
  23. 23 43rd
  24. 24 47th
  25. 25 51st
  26. 26 Garfield
  27. 27 King Drive
  28. 28 Cottage Grove Terminal

Branch to-ashland63rd (from Garfield)

  1. 1 Halsted
  2. 2 Ashland/63rd Terminal

Interchanges with other lines

At these stations you can change from Green Line to another line:

StationIntegrates with
Ashland Pink Line
Morgan Pink Line
Clinton Pink Line
Clark/Lake Blue Line Brown Line Orange Line Pink Line Purple Line
Washington/Wabash Brown Line Orange Line Pink Line Purple Line
Adams/Wabash Brown Line Orange Line Pink Line Purple Line
Roosevelt Orange Line Red Line

Frequently asked questions

How many stations does Green Line have?

Green Line has 30 stations, from Harlem/Lake to Cottage Grove.

How long is the end-to-end trip on Green Line?

About 78 minutes between Harlem/Lake and Cottage Grove. It is an estimate based on the distance between stations; the real time varies through the day.

Where does Green Line connect with other lines?

The interchanges are: Ashland (Pink Line); Morgan (Pink Line); Clinton (Pink Line); Clark/Lake (Blue Line, Brown Line, Orange Line, Pink Line, Purple Line); Washington/Wabash (Brown Line, Orange Line, Pink Line, Purple Line); Adams/Wabash (Brown Line, Orange Line, Pink Line, Purple Line); Roosevelt (Orange Line, Red Line).

Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.

Route from Harlem/Lake to Cottage Grove

All lines and stations of Chicago L