Yunusobod Line: stations, map and interchanges

Yunusobod Line is a line of Tashkent Metro in Tashkent with 8 stations, running from Turkiston to Mingoʻrik. As the crow flies, the stations add up to about 9.0 km and the end-to-end trip takes around 20 minutes (estimated, no waiting on platforms).

View Yunusobod Line on the interactive map →

Status right now: No alerts in the news
From news reports · checked at 13:07

Stations of Yunusobod Line

In track order, from Turkiston to Mingoʻrik.

  1. 1 Turkiston Terminal
  2. 2 Yunusobod
  3. 3 Shahriston
  4. 4 Bodomzor
  5. 5 Minor
  6. 6 Abdulla Qodiriy
  7. 7 Yunus Rajabiy
  8. 8 Mingoʻrik Terminal

Frequently asked questions

How many stations does Yunusobod Line have?

Yunusobod Line has 8 stations, from Turkiston to Mingoʻrik.

How long is the end-to-end trip on Yunusobod Line?

About 20 minutes between Turkiston and Mingoʻrik. It is an estimate based on the distance between stations; the real time varies through the day.

Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.

Route from Turkiston to Mingoʻrik

All lines and stations of Tashkent Metro