Line 17: stations, map and interchanges
Line 17 is a line of Beijing Subway in Beijing with 20 stations, running from Future Science City North to Jiahuihu. As the crow flies, the stations add up to about 45.7 km and the end-to-end trip takes around 93 minutes (estimated, no waiting on platforms).
View Line 17 on the interactive map →
Status right now:
No alerts in the news
From news reports · checked at 15:35
Stations of Line 17
- 1 Future Science City North Terminal
- 2 Future Science City
- 3 Tiantongyuandong Interchange
- 4 Qingheying
- 5 Hongjunying
- 6 Wangjing West Interchange
- 7 Taiyanggong Interchange
- 8 Xibahe Interchange
- 9 Zuojiazhuang
- 10 Workers' Stadium Interchange
- 11 Dongdaqiao Interchange
- 12 Yonganli Interchange
- 13 Panjiayuanxi
- 14 Shilihe Interchange
- 15 Zhoujiazhuang
- 16 Shibalidian
- 17 Beishenshu
- 18 Ciqubei
- 19 Ciqu Interchange
- 20 Jiahuihu Terminal
Interchanges with other lines
At these stations you can change from Line 17 to another line:
Frequently asked questions
How many stations does Line 17 have?
Line 17 has 20 stations, from Future Science City North to Jiahuihu.
How long is the end-to-end trip on Line 17?
About 93 minutes between Future Science City North and Jiahuihu. It is an estimate based on the distance between stations; the real time varies through the day.
Where does Line 17 connect with other lines?
The interchanges are: Tiantongyuandong (Line 18); Wangjing West (Line 13, Line 15); Taiyanggong (Line 10); Xibahe (Line 12); Workers' Stadium (Line 3); Dongdaqiao (Line 6); Yonganli (Line 1 / Batong Line); Shilihe (Line 10, Line 14); Ciqu (Yizhuang Line).
Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.