Line 18: stations, map and interchanges
Line 18 is a line of Beijing Subway in Beijing with 11 stations, running from Malianwa to Tiantongyuandong. As the crow flies, the stations add up to about 17.1 km and the end-to-end trip takes around 36 minutes (estimated, no waiting on platforms).
View Line 18 on the interactive map →
Status right now:
No alerts in the news
From news reports · checked at 15:35
Stations of Line 18
- 1 Malianwa Terminal Interchange
- 2 Shangdi Software Park
- 3 Dongbeiwang
- 4 Longzexi
- 5 Huilongguan Xidajie
- 6 Wenhualu
- 7 Huilongguan Dongdajie Interchange
- 8 Huoyingdong
- 9 Tiantongyuan Interchange
- 10 Taipingzhuang
- 11 Tiantongyuandong Terminal Interchange
Interchanges with other lines
At these stations you can change from Line 18 to another line:
| Station | Integrates with |
|---|---|
| Malianwa | Line 16 |
| Huilongguan Dongdajie | Line 8 |
| Tiantongyuan | Line 5 |
| Tiantongyuandong | Line 17 |
Frequently asked questions
How many stations does Line 18 have?
Line 18 has 11 stations, from Malianwa to Tiantongyuandong.
How long is the end-to-end trip on Line 18?
About 36 minutes between Malianwa and Tiantongyuandong. It is an estimate based on the distance between stations; the real time varies through the day.
Where does Line 18 connect with other lines?
The interchanges are: Malianwa (Line 16); Huilongguan Dongdajie (Line 8); Tiantongyuan (Line 5); Tiantongyuandong (Line 17).
Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.