Line 18: stations, map and interchanges

Line 18 is a line of Beijing Subway in Beijing with 11 stations, running from Malianwa to Tiantongyuandong. As the crow flies, the stations add up to about 17.1 km and the end-to-end trip takes around 36 minutes (estimated, no waiting on platforms).

View Line 18 on the interactive map →

Status right now: No alerts in the news
From news reports · checked at 15:35

Stations of Line 18

In track order, from Malianwa to Tiantongyuandong.

  1. 1 Malianwa Terminal Interchange
  2. 2 Shangdi Software Park
  3. 3 Dongbeiwang
  4. 4 Longzexi
  5. 5 Huilongguan Xidajie
  6. 6 Wenhualu
  7. 7 Huilongguan Dongdajie Interchange
  8. 8 Huoyingdong
  9. 9 Tiantongyuan Interchange
  10. 10 Taipingzhuang
  11. 11 Tiantongyuandong Terminal Interchange

Interchanges with other lines

At these stations you can change from Line 18 to another line:

StationIntegrates with
Malianwa Line 16
Huilongguan Dongdajie Line 8
Tiantongyuan Line 5
Tiantongyuandong Line 17

Frequently asked questions

How many stations does Line 18 have?

Line 18 has 11 stations, from Malianwa to Tiantongyuandong.

How long is the end-to-end trip on Line 18?

About 36 minutes between Malianwa and Tiantongyuandong. It is an estimate based on the distance between stations; the real time varies through the day.

Where does Line 18 connect with other lines?

The interchanges are: Malianwa (Line 16); Huilongguan Dongdajie (Line 8); Tiantongyuan (Line 5); Tiantongyuandong (Line 17).

Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.

Route from Malianwa to Tiantongyuandong

All lines and stations of Beijing Subway