Line 1: stations, map and interchanges
Line 1 is a line of Changchun Rail Transit in Changchun with 15 stations, running from North Ring Road to Hongzuizi. As the crow flies, the stations add up to about 17.6 km and the end-to-end trip takes around 39 minutes (estimated, no waiting on platforms).
View Line 1 on the interactive map →
Status right now:
No alerts in the news
From news reports · checked at 15:46
Stations of Line 1
- 1 North Ring Road Terminal Interchange
- 2 Qingfeng Road
- 3 Yikuang Street
- 4 Changchun Railway Station (North) Interchange
- 5 Changchun Railway Station Interchange
- 6 Shengli Park
- 7 Renmin Square Interchange
- 8 Jiefang Avenue Interchange
- 9 Northeast Normal University
- 10 Gongnong Square Interchange
- 11 Fanrong Road
- 12 Weixing Square Interchange
- 13 Municipal Government
- 14 Huaqing Road Interchange
- 15 Hongzuizi Terminal
Interchanges with other lines
At these stations you can change from Line 1 to another line:
Frequently asked questions
How many stations does Line 1 have?
Line 1 has 15 stations, from North Ring Road to Hongzuizi.
How long is the end-to-end trip on Line 1?
About 39 minutes between North Ring Road and Hongzuizi. It is an estimate based on the distance between stations; the real time varies through the day.
Where does Line 1 connect with other lines?
The interchanges are: North Ring Road (Line 8); Changchun Railway Station (North) (Line 4); Changchun Railway Station (Line 3); Renmin Square (Line 5); Jiefang Avenue (Line 2); Gongnong Square (Line 7); Weixing Square (Line 3); Huaqing Road (Line 6).
Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.