Line 2: stations, map and interchanges
Line 2 is a line of Changchun Rail Transit in Changchun with 27 stations, running from Automobile Park to Wukaihe Dajie. As the crow flies, the stations add up to about 34.7 km and the end-to-end trip takes around 76 minutes (estimated, no waiting on platforms).
View Line 2 on the interactive map →
Status right now:
No alerts in the news
From news reports · checked at 15:41
Stations of Line 2
- 1 Automobile Park Terminal Interchange
- 2 Jieda Avenue
- 3 Xihu
- 4 Shuangfeng Interchange
- 5 Changchun West Railway Station Interchange
- 6 Xinglongpu
- 7 West Huancheng Road
- 8 Heping Street
- 9 Wanfu Street
- 10 Jingyang Square
- 11 Jiefang Overpass Interchange
- 12 Jianshe Square
- 13 Wenhua Square Interchange
- 14 Jiefang Avenue Interchange
- 15 Pingyang Street
- 16 Nanguan
- 17 Jilin Avenue Interchange
- 18 Dongsheng Dajie
- 19 East Ring Road Interchange
- 20 Changqing
- 21 Dongfang Square
- 22 Ha'erbin Dajie
- 23 Doujiagou
- 24 Yingjun Dajie
- 25 Yingkai Dajie
- 26 Linxi Dajie
- 27 Wukaihe Dajie Terminal
Interchanges with other lines
At these stations you can change from Line 2 to another line:
Frequently asked questions
How many stations does Line 2 have?
Line 2 has 27 stations, from Automobile Park to Wukaihe Dajie.
How long is the end-to-end trip on Line 2?
About 76 minutes between Automobile Park and Wukaihe Dajie. It is an estimate based on the distance between stations; the real time varies through the day.
Where does Line 2 connect with other lines?
The interchanges are: Automobile Park (Line 7); Shuangfeng (Line 6); Changchun West Railway Station (Line 6); Jiefang Overpass (Line 3); Wenhua Square (Line 5); Jiefang Avenue (Line 1); Jilin Avenue (Line 4); East Ring Road (Line 7).
Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.