Line 10: stations, map and interchanges
Line 10 is a line of Shenzhen Metro in Shenzhen with 24 stations, running from Futian Checkpoint to Shuangyong Street. As the crow flies, the stations add up to about 27.8 km and the end-to-end trip takes around 62 minutes (estimated, no waiting on platforms).
View Line 10 on the interactive map →
Status right now:
No alerts in the news
From news reports · checked at 15:56
Stations of Line 10
- 1 Futian Checkpoint Terminal Interchange
- 2 Fumin Interchange
- 3 Gangxia Interchange
- 4 Gangxia North Interchange
- 5 Lianhuacun Interchange
- 6 Donggualing
- 7 Maling Interchange
- 8 Yabao
- 9 Nankeng
- 10 Guangyayuan
- 11 Wuhe Interchange
- 12 Bantian North
- 13 Bei'er Road
- 14 Huawei
- 15 Gangtou
- 16 Xuexiang
- 17 Gankeng
- 18 Liangmao Hill
- 19 Shanglilang
- 20 Mugu
- 21 Huanancheng
- 22 Hehua
- 23 Pinghu
- 24 Shuangyong Street Terminal
Interchanges with other lines
At these stations you can change from Line 10 to another line:
| Station | Integrates with |
|---|---|
| Futian Checkpoint | Line 4 |
| Fumin | Line 4 Line 7 |
| Gangxia | Line 1 |
| Gangxia North | Line 2 Line 11 Line 14 |
| Lianhuacun | Line 3 |
| Maling | Line 9 |
| Wuhe | Line 5 |
Frequently asked questions
How many stations does Line 10 have?
Line 10 has 24 stations, from Futian Checkpoint to Shuangyong Street.
How long is the end-to-end trip on Line 10?
About 62 minutes between Futian Checkpoint and Shuangyong Street. It is an estimate based on the distance between stations; the real time varies through the day.
Where does Line 10 connect with other lines?
The interchanges are: Futian Checkpoint (Line 4); Fumin (Line 4, Line 7); Gangxia (Line 1); Gangxia North (Line 2, Line 11, Line 14); Lianhuacun (Line 3); Maling (Line 9); Wuhe (Line 5).
Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.