Line 5: stations, map and interchanges

Line 5 is a line of Shenzhen Metro in Shenzhen with 37 stations, running from Chiwan to Grand Theater. As the crow flies, the stations add up to about 47.2 km and the end-to-end trip takes around 104 minutes (estimated, no waiting on platforms).

View Line 5 on the interactive map →

Status right now: No alerts in the news
From news reports · checked at 15:46

Network hours

ServiceOpensCloses
All lines, working days05:3200:44 (night after the service day; last departure from any station)
All lines, rest days (weekends)05:3200:44 (night after the service day; last departure from any station)
All lines, public holidays05:3201:41 (night after the service day; last departure from any station)

Reference hours: they vary by line, station and day (holidays, events and works). Always confirm on the official channels.

Hours and line status today →

Stations of Line 5

In track order, from Chiwan to Grand Theater.

  1. 1 Chiwan Terminal Interchange
  2. 2 Liwan
  3. 3 Railway Park
  4. 4 Mawan
  5. 5 Qianwan Park
  6. 6 Qianwan Interchange
  7. 7 Guiwan
  8. 8 Qianhaiwan Interchange
  9. 9 Linhai
  10. 10 Baohua
  11. 11 Bao'an Center Interchange
  12. 12 Fanshen
  13. 13 Lingzhi Interchange
  14. 14 Honglang North
  15. 15 Xingdong
  16. 16 Liuxiandong Interchange
  17. 17 Xili Interchange
  18. 18 University Town
  19. 19 Tanglang
  20. 20 Changlingbei
  21. 21 Shenzhen North Railway Station Interchange
  22. 22 Minzhi
  23. 23 Wuhe Interchange
  24. 24 Bantian
  25. 25 Yangmei
  26. 26 Shangshuijing
  27. 27 Xiashuijing
  28. 28 Changlong
  29. 29 Buji Interchange
  30. 30 Baigelong
  31. 31 Buxin
  32. 32 Tai'an Interchange
  33. 33 Yijing
  34. 34 Huangbeiling Interchange
  35. 35 Hubei Interchange
  36. 36 Dongmen
  37. 37 Grand Theater Terminal Interchange

Interchanges with other lines

At these stations you can change from Line 5 to another line:

StationIntegrates with
Chiwan Line 2
Qianwan Line 9
Qianhaiwan Line 1 Line 11
Bao'an Center Line 1
Lingzhi Line 12
Liuxiandong Line 13
Xili Line 7
Shenzhen North Railway Station Line 4 Line 6
Wuhe Line 10
Buji Line 3 Line 14
Tai'an Line 7
Huangbeiling Line 2
Hubei Line 2
Grand Theater Line 1 Line 2

Frequently asked questions

How many stations does Line 5 have?

Line 5 has 37 stations, from Chiwan to Grand Theater.

How long is the end-to-end trip on Line 5?

About 104 minutes between Chiwan and Grand Theater. It is an estimate based on the distance between stations; the real time varies through the day.

Where does Line 5 connect with other lines?

The interchanges are: Chiwan (Line 2); Qianwan (Line 9); Qianhaiwan (Line 1, Line 11); Bao'an Center (Line 1); Lingzhi (Line 12); Liuxiandong (Line 13); Xili (Line 7); Shenzhen North Railway Station (Line 4, Line 6); Wuhe (Line 10); Buji (Line 3, Line 14); Tai'an (Line 7); Huangbeiling (Line 2); Hubei (Line 2); Grand Theater (Line 1, Line 2).

Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.

Route from Chiwan to Grand Theater

All lines and stations of Shenzhen Metro