According to Diário do Transporte, CPTM has opened a tender to install multimedia visual communication at the stations of Line 10-Turquesa in São Paulo. The line runs from Palmeiras-Barra Funda, in the capital, to Rio Grande da Serra in the ABC region. Bids can already be submitted, and the electronic session is scheduled for 3 December at 9am.
The official gazette does not say which stations will be covered, what equipment will be installed, or when multimedia communication will be available to passengers. According to the publication, this is the opening of a procurement process, not an announcement that installation work has started.
What the line includes
The list of stations published by CPTM covers 15 stations: Palmeiras-Barra Funda, Luz, Brás, Juventus-Mooca, Ipiranga and Tamanduateí in the capital, and São Caetano do Sul, Utinga, Prefeito Saladino, Prefeito Celso Daniel–Santo André, Capuava, Mauá, Guapituba, Ribeirão Pires and Rio Grande da Serra on the ABC route. This is the list of stations in operation, not a list of the sites included in the contract.
Other changes on the same day
In the same edition, CPTM published two purchases of railway components. One is for insulating pads from Rail Parts Ltda., worth R$ 57,400, and the other is for brake levers and cranks from Lacerda Brasil Materiais Ferroviários Ltda., worth R$ 17,700. Both contracts are valid for 90 days. The notices do not link these items to the visual communication tender.
The Metrô de São Paulo also opened a tender for the supply of a radial fan rotor, with the session set for 2 December at 9am. The notice does not identify the station or facility where the component will be used.
Platform changes at Mauá and Santo André
The tender is separate from the modernisation works that have already changed boarding at Mauá and Santo André. Those works began on 12 November and are expected to close platform 1 for eight months. For trains heading to Palmeiras-Barra Funda, CPTM has indicated platform 2 at Prefeito Celso Daniel–Santo André and platforms 2 and 3 at Mauá.
For passengers, according to Diário do Transporte, the publication does not change timetables, platforms or train intervals.