Line 4: stations, map and interchanges
Line 4 is a line of Chongqing Rail Transit in Chongqing with 32 stations, running from Shimahelijiao to Huangling. As the crow flies, the stations add up to about 54.2 km and the end-to-end trip takes around 114 minutes (estimated, no waiting on platforms).
View Line 4 on the interactive map →
Status right now:
No alerts in the news
From news reports · checked at 15:41
Stations of Line 4
- 1 Shimahelijiao Terminal
- 2 Yudaishan Interchange
- 3 Panxi
- 4 Dashiba Interchange
- 5 Daqingcun
- 6 Huahuiyuan Interchange
- 7 Longxi
- 8 Jiazhou Road Interchange
- 9 Min'an Avenue Interchange
- 10 Chongqing North Station North Square Interchange
- 11 Toutang Interchange
- 12 Baoshuigang Interchange
- 13 Cuntan
- 14 Heishizi
- 15 Gangcheng
- 16 Taipingchong
- 17 Tangjiatuo
- 18 Tieshanping
- 19 Luqi
- 20 Guoyuan Logistics Hub
- 21 Yuzui
- 22 Yanping
- 23 Shiheqing
- 24 Fusheng
- 25 Sanbanxi
- 26 Longyi Ave.
- 27 Longxing
- 28 Gaoshita
- 29 Pufu
- 30 Tongzilin
- 31 Shichuan
- 32 Huangling Terminal
Interchanges with other lines
At these stations you can change from Line 4 to another line:
Frequently asked questions
How many stations does Line 4 have?
Line 4 has 32 stations, from Shimahelijiao to Huangling.
How long is the end-to-end trip on Line 4?
About 114 minutes between Shimahelijiao and Huangling. It is an estimate based on the distance between stations; the real time varies through the day.
Where does Line 4 connect with other lines?
The interchanges are: Yudaishan (Loop Line (环)); Dashiba (Line 5); Huahuiyuan (Line 6); Jiazhou Road (Line 3 (monorail)); Min'an Avenue (Loop Line (环)); Chongqing North Station North Square (Line 10); Toutang (Line 9); Baoshuigang (Line 9).
Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.