Line 9: stations, map and interchanges
Line 9 is a line of Chongqing Rail Transit in Chongqing with 29 stations, running from Huashigou to Gaotanyan. As the crow flies, the stations add up to about 37.3 km and the end-to-end trip takes around 82 minutes (estimated, no waiting on platforms).
View Line 9 on the interactive map →
Status right now:
No alerts in the news
From news reports · checked at 15:41
Stations of Line 9
- 1 Huashigou Terminal
- 2 Chongyansi
- 3 Central Park East Interchange
- 4 Langui Avenue
- 5 Chunhua Avenue
- 6 Xingke Avenue
- 7 Baoshenghu
- 8 Qinggangping
- 9 Shangwanlu Interchange
- 10 Shipanhe
- 11 Hejialiang
- 12 Baoshuigang Interchange
- 13 Toutang Interchange
- 14 Gailanxi
- 15 Wulidian Interchange
- 16 Jiangbeicheng Interchange
- 17 Liujiatai
- 18 Liyuchi Interchange
- 19 Guanyinqiao Interchange
- 20 Mahuangliang
- 21 Lijiaping
- 22 Hualongqiao
- 23 Fuhualu Interchange
- 24 Hongyancun Interchange
- 25 Tuwan
- 26 Xialongkan Interchange
- 27 Shapingba Interchange
- 28 Tianlilu
- 29 Gaotanyan Terminal
Interchanges with other lines
At these stations you can change from Line 9 to another line:
Frequently asked questions
How many stations does Line 9 have?
Line 9 has 29 stations, from Huashigou to Gaotanyan.
How long is the end-to-end trip on Line 9?
About 82 minutes between Huashigou and Gaotanyan. It is an estimate based on the distance between stations; the real time varies through the day.
Where does Line 9 connect with other lines?
The interchanges are: Central Park East (Line 10); Shangwanlu (Line 10); Baoshuigang (Line 4); Toutang (Line 4); Wulidian (Line 6, Loop Line (环)); Jiangbeicheng (Line 6); Liyuchi (Line 10); Guanyinqiao (Line 3 (monorail)); Fuhualu (Line 18); Hongyancun (Line 5); Xialongkan (Line 1); Shapingba (Line 1, Loop Line (环)).
Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.