Line 5: stations, map and interchanges

Line 5 is a line of Chongqing Rail Transit in Chongqing with 32 stations, running from Tiaodeng to Yuegangbeilu. As the crow flies, the stations add up to about 45.2 km and the end-to-end trip takes around 98 minutes (estimated, no waiting on platforms).

View Line 5 on the interactive map →

Status right now: No alerts in the news
From news reports · checked at 15:41

Stations of Line 5

In track order, from Tiaodeng to Yuegangbeilu.

  1. 1 Tiaodeng Terminal Interchange
  2. 2 Huayan Center
  3. 3 Jinjianlu
  4. 4 Zhongliangshan
  5. 5 Banshan
  6. 6 Huachenglu
  7. 7 Huayan Temple
  8. 8 Chongqing West Railway Station Interchange
  9. 9 Fengxilu
  10. 10 Bashan
  11. 11 Shixinlu
  12. 12 Shiqiaopu Interchange
  13. 13 Xietaizi Interchange
  14. 14 Hongyancun Interchange
  15. 15 Zhongshutuo
  16. 16 Dashiba Interchange
  17. 17 Dalongshan Interchange
  18. 18 Ranjiaba Interchange
  19. 19 Xingfu Square
  20. 20 Renhe
  21. 21 Hemulu
  22. 22 Chongguang
  23. 23 Huxiajie
  24. 24 Danhe
  25. 25 The EXPO Garden Center
  26. 26 Yuhegou
  27. 27 Ganyue Avenue
  28. 28 Lujiagou
  29. 29 Central Park West Interchange
  30. 30 Chunxuan Avenue
  31. 31 Yuegang Avenue
  32. 32 Yuegangbeilu Terminal

Interchanges with other lines

At these stations you can change from Line 5 to another line:

StationIntegrates with
Tiaodeng Line 18
Chongqing West Railway Station Loop Line (环)
Shiqiaopu Line 1
Xietaizi Line 1 Line 18
Hongyancun Line 9
Dashiba Line 4
Dalongshan Line 6
Ranjiaba Line 6 Loop Line (环)
Central Park West Line 10

Frequently asked questions

How many stations does Line 5 have?

Line 5 has 32 stations, from Tiaodeng to Yuegangbeilu.

How long is the end-to-end trip on Line 5?

About 98 minutes between Tiaodeng and Yuegangbeilu. It is an estimate based on the distance between stations; the real time varies through the day.

Where does Line 5 connect with other lines?

The interchanges are: Tiaodeng (Line 18); Chongqing West Railway Station (Loop Line (环)); Shiqiaopu (Line 1); Xietaizi (Line 1, Line 18); Hongyancun (Line 9); Dashiba (Line 4); Dalongshan (Line 6); Ranjiaba (Line 6, Loop Line (环)); Central Park West (Line 10).

Travel times are estimates calculated from the distance between stations, not official timetables. Confirm the service with the official channels of the operator.

Route from Tiaodeng to Yuegangbeilu

All lines and stations of Chongqing Rail Transit